Yarrows Bakery
With over 5,000sqm of floor space across a very busy food production site, meant a 24hr-shift, and managed approach to reduce production impact for the client.
• Full extraction, grinding and removal of old floor coating using walk-behind grinders
• Add 3mm anti-microbial non-slip floor coating
• Flowcrete rolled coating
• 5-day project (24hours a day) / 6 people
Managed time to reduce production impact on client.
• Full extraction, grinding and removal of old floor coating using walk-behind grinders
• Add 3mm anti-microbial non-slip floor coating
• Flowcrete rolled coating
• 5-day project (24hours a day) / 6 people
Managed time to reduce production impact on client.
Yarrows Bakery Silos
Six large silos (10-15m high) fully contained and scaffolded. Planned work site and consideration of public traffic and operational safety paramount.
• Wet abrasive (Geoblaster)
• Three coat carboline epoxy industrial coating system
• 3-month project / 3 people
• Wet abrasive (Geoblaster)
• Three coat carboline epoxy industrial coating system
• 3-month project / 3 people
Fonterra Butter Cool Store
Considered the largest job of its kind in Australasia, this 13,000sqm retrofit roof and poly panel replacement project required no loss of production time to the client.
• Sika Sarnafil overlay waterproof
• PVC sheet membrane
• Fully adhered and welded details
• 2-year project / 8 staff
• Sika Sarnafil overlay waterproof
• PVC sheet membrane
• Fully adhered and welded details
• 2-year project / 8 staff
Fonterra Kapuni
This roof only project allowed continue production for the client.
• Sika MTC
• Fibre reinforced liquid membrane
• 1,600sqm
• One-month project / six staff
• Sika MTC
• Fibre reinforced liquid membrane
• 1,600sqm
• One-month project / six staff